First build day: A Time Lapse

On Saturday, April 18th the Chico and Santa Cruz crews teamed up and assembled the 140-piece, 20-foot wide “3222”  installation.

“3222” installation by Erin Banwell, based on an original design by David Seied.

Check out more about how it was designed and built!

Similar Posts